Click to call! Ask James Duffy about our nationwide fixedrate pricing!
RESOURCES
Read the latest from the IFTI PROvision Team
3D Scanning Across the Construction Lifecycle: A PM’s Guide
Why Continuous Documentation Beats the One-Time Site Survey Treating 3D scanning as a single event, a walkthrough at kickoff or a marketing reel at ribbon-cutting,
NTE-642 Case Study: How a PROvision 3D Capture Replaces Outdated Site Records
The Documentation Challenge on NTE-642 NTE-642 is documented internally as an IFTI PROvision engagement, but the site’s exact scope, location, and building type remain unconfirmed
The BNC Project in 3D: Turning a Model Into an Operations Tool
What a 3D Project Model Is Supposed to Do A 3D project model’s job is to answer questions remotely that would otherwise require a plane
How to Request a 3D Scan: The IFTI PROvision Process Explained
What Happens When You Request a 3D Scan from IFTI PROvision Requesting a 3D scan from IFTI PROvision follows a four-step sequence: submit a quote
Senior Living 3D Model Case Study: A Shared Design Reference
The Challenge: Communicating a Senior-Living Community Before It’s Built Architects, contractors, operators, and marketing teams often work from different documents when planning a senior-living community:
Senior Living 3D Model Case Study | Accessible Design Walkthrough
Senior Living 3D Model Case Study This case study documents a real assisted living and memory care community modeled through IFTI’s PROvision program, using an
Top 10 Construction Risk Management Tips for Contractors and Owners
Why Construction Risk Management Is a Process, Not a Checklist Construction risk management is the ongoing cycle of identifying, assessing, responding to, and monitoring threats
IFTI Launches PROvision: 3D Digital Twin Imaging for Multi-Location Portfolios
IFTI Expands Its Offerings: Introducing PROvision IFTI has added a new service line called PROvision, a 3D digital imaging solution built to give operations and
Remote Asset Lifecycle Management: Why It’s Now an FM Priority
The Shift From Reactive to Remote: Why This Trend Has Reached a Tipping Point Remote asset lifecycle management describes the practice of monitoring, maintaining, and
5 Ways 3D Digital Imaging Strengthens Facility Management Strategy
Why Facility Managers Are Rethinking How They Document Their Buildings Facilities teams are moving away from static floor plans and outdated as-builts toward living 3D
Madison Square Park: A 3D Digital Twin Thought Experiment
A Small Park With an Outsized History Madison Square Park sits on land that has been public property longer than the United States has existed
IFTI PROvision Case Studies: How Multi-Site Teams Solve Documentation Gaps
Why This Article Doesn’t Name Client Brands This article does not name specific IFTI PROvision clients. IFTI does not publish client identities without authorization, so
Contact Us & Get a free consultation
James Duffy & Joe Everly will explain how
the IFTI PROvision solution
can transform your business.
Contact us using the form below of the phone number listed on this page.